History
The long-awaited Neihu Line has had many delays prior to its opening. Since the Neihu Line was planned as an extension to the Wenshan Line, the original plan called for a similar elevated medium-capacity line. However, due to the growth of the Neihu District, many residents and politicians called for an underground, high-capacity line instead (similar to the Blue Line (TRTS)).
The initial cost estimate of the elevated line was NT$42.6 billion, but due to delays the price-adjusted cost estimate rose to over NT$60.3 billion. A shift to underground construction would have increased the cost to as high as NT$134.4 billion. However, the Central Government stated that if construction for the Neihu Line did not start immediately, they would withhold the grant money for the line. In addition, due to the narrow streets and numerous turns in Neihu, construction of an underground high-capacity line would have been infeasible. Thus, the plan to build an elevated line continued after much delay.
There was also significant debate whether Songshan Airport should be included on the route. The addition of the station added an additional 1.9 kilometres (1.2 mi) to the line's length. Because of the inclusion of the station, the final cost of the line reached NT$66.7 billion.
The line was initially planned to begin service in 1996, and after 13 years of delay, the line finally began operations. However, the Neihu Line has been criticized for its frequent malfunctions and safety issues.
Read more about this topic: Neihu Line (Taipei Metro)
Famous quotes containing the word history:
“It takes a great deal of history to produce a little literature.”
—Henry James (18431916)
“As History stands, it is a sort of Chinese Play, without end and without lesson.”
—Henry Brooks Adams (18381918)
“The history of all hitherto existing society is the history of class struggles.”
—Karl Marx (18181883)