Metromover - Operating Cost

Operating Cost

Cost of building the system was about $153.3 million. The operating budget for Inner and Outer (Brickell and Omni) loops, in FY 2007 was $8,888,794. Ridership total for FY 2007 was 8.7 million. This gives approx. cost of 1.02 dollar per ride, but as the system is free, the passenger ride numbers may increase maximally to bigger numbers(approx. full cars multiplied by days of operating), and doesn't include potential Miami income from people not wasting time in traffic.

Read more about this topic:  Metromover

Famous quotes containing the words operating and/or cost:

    “Go on then in doing with your pen what in other times was done with the sword; shew that reformation is more practicable by operating on the mind than on the body of man.”
    —Thomas Jefferson (1743–1826)

    “The Fountaine of parents duties is Love....Great reason there is why this affection should be fast fixed towards their children. For great is that paine, cost, and care, which parents must undergoe for their children. But if love be in them, no paine, paines, cost or care will seeme too much.”
    —William Gouge (20th century)