Operating Cost
Cost of building the system was about $153.3 million. The operating budget for Inner and Outer (Brickell and Omni) loops, in FY 2007 was $8,888,794. Ridership total for FY 2007 was 8.7 million. This gives approx. cost of 1.02 dollar per ride, but as the system is free, the passenger ride numbers may increase maximally to bigger numbers(approx. full cars multiplied by days of operating), and doesn't include potential Miami income from people not wasting time in traffic.
Read more about this topic: Metromover
Famous quotes containing the words operating and/or cost:
“... the modern drama, operating through the double channel of dramatist and interpreter, affecting as it does both mind and heart, is the strongest force in developing social discontent, swelling the powerful tide of unrest that sweeps onward and over the dam of ignorance, prejudice, and superstition.”
—Emma Goldman (18691940)
“The Fountaine of parents duties is Love....Great reason there is why this affection should be fast fixed towards their children. For great is that paine, cost, and care, which parents must undergoe for their children. But if love be in them, no paine, paines, cost or care will seeme too much.”
—William Gouge (20th century)