London and Croydon Railway - Operation

Operation

The line into London Bridge became increasingly congested so at Corbetts Lane a white disc was installed, to be operated by the pointsman. It, or at night a red light, showed that the route was set for Croydon. If the disc was edge on, or a white light showed, the junction was set for Greenwich. It is believed that this was first fixed signal used to control a junction. Greenwich trains ran every 15 minutes, Croydon trains were hourly. The first railway semaphore signal was erected by Charles Hutton Gregory on the railway at New Cross, about 1842.

Read more about this topic:  London And Croydon Railway

Famous quotes containing the word operation:

    An absolute can only be given in an intuition, while all the rest has to do with analysis. We call intuition here the sympathy by which one is transported into the interior of an object in order to coincide with what there is unique and consequently inexpressible in it. Analysis, on the contrary, is the operation which reduces the object to elements already known.
    Henri Bergson (1859–1941)

    Waiting for the race to become official, he began to feel as if he had as much effect on the final outcome of the operation as a single piece of a jumbo jigsaw puzzle has to its predetermined final design. Only the addition of the missing fragments of the puzzle would reveal if the picture was as he guessed it would be.
    Stanley Kubrick (b. 1928)

    Human knowledge and human power meet in one; for where the cause is not known the effect cannot be produced. Nature to be commanded must be obeyed; and that which in contemplation is as the cause is in operation as the rule.
    Francis Bacon (1560–1626)