Line 15, Beijing Subway - Route

Route

Phase I is planned to be 38.3 km long with 18 stations., covers the eastern half of Line 15 and connects the suburbs of Shunyi District with the existing subway network at Wangjing West (Line 13), Datun Lu East (Line 5) and at the Olympic Green (Line 8). Currently Sections 1 and 2 of Phase 1 are operational. It has 8 stations and is over 22 km in length. The two operational sections run from the Wangjing West on Line 13 to Fengbo in Shunyi District. Line 15 travels underground from Beishatan to Maquanying, and then goes above ground on an elevated track to Houshayu before returning underground and going underneath the Chaobai River to Fengbo. The elevated section is high enough to allow elevated roads to pass underneath. A major public venue on Line 15 route is the New China International Exposition Center (New CIEC) 新国展 at the China International Exhibition Center station 国展站. New CIEC holds the annual Beijing International Automotive Exhibition which attracted 800,000 visitors in 2012.

Read more about this topic:  Line 15, Beijing Subway

Famous quotes containing the word route:

    By a route obscure and lonely,
    Haunted by ill angels only,
    Where an eidolon, named Night,
    On a black throne reigns upright,
    I have reached these lands but newly
    From an ultimate dim Thule—
    From a wild weird clime that lieth, sublime,
    Out of space—out of time.
    Edgar Allan Poe (1809–1849)

    But however the forms of family life have changed and the number expanded, the role of the family has remained constant and it continues to be the major institution through which children pass en route to adulthood.
    Bernice Weissbourd (20th century)

    In the mountains the shortest route is from peak to peak, but for that you must have long legs. Aphorisms should be peaks: and those to whom they are spoken should be big and tall of stature.
    Friedrich Nietzsche (1844–1900)