Line 15, Beijing Subway
Line 15 of the Beijing Subway (simplified Chinese: 北京地铁15号线; traditional Chinese: 北京地鐵15號線; pinyin: běijīng dìtiě shíwǔhào xiàn) is a rapid transit rail line in northern Beijing with one portion in operation and the remainder under construction. In all, the line is set to have a total length of 45.7 km across northern Beijing from Xiyuan in Haidian District in the west, to Hedong in Shunyi District in the east. It is being built in two phases. Phase I covers the eastern half of Line 15 from Beishatan in Chaoyang District to Fengbo in Shunyi District. It will cost ¥17.6 billion. Section 3 of Phase 1 is set to follow in 2014. Phase II is expected to be completed by 2015. The line features 6-car trains similar to other lines in the Beijing Subway. Line 15 tunnels will be up to 38 m underground, making them the deepest in Beijing's subway system. Trains run every seven and a half minutes, with a journey from Fengbo to Wangjing West Station taking 38 minutes.
Read more about Line 15, Beijing Subway: Route, History, Route Under Construction, Gallery
Famous quotes containing the words line and/or subway:
“It is a great many years since at the outset of my career I had to think seriously what life had to offer that was worth having. I came to the conclusion that the chief good for me was freedom to learn, think, and say what I pleased, when I pleased. I have acted on that conviction... and though strongly, and perhaps wisely, warned that I should probably come to grief, I am entirely satisfied with the results of the line of action I have adopted.”
—Thomas Henry Huxley (182595)
“I leave you, home,
when Im ripped from the doorstep
by commerce or fate. Then I submit
to the awful subway of the world....”
—Anne Sexton (19281974)