Kelowna Pacific Railway - Operations

Operations

KPR transports over 16,000 carloads per year. Most of the goods transported by KPR are wood products; although grain, cement, scrap metal and industrial products can be seen. Currently KPR runs trains 5 days per week and their schedule is as follows:

  • Kelowna: Monday and Wednesday (Trains stay overnight and return to Vernon on Tuesday and Thursday)
  • Lumby: Tuesday and Friday
  • Kamloops: Can run any day of the week as needed

Read more about this topic:  Kelowna Pacific Railway

Famous quotes containing the word operations:

    You can’t have operations without screams. Pain and the knife—they’re inseparable.
    —Jean Scott Rogers. Robert Day. Mr. Blount (Frank Pettingell)

    It may seem strange that any road through such a wilderness should be passable, even in winter, when the snow is three or four feet deep, but at that season, wherever lumbering operations are actively carried on, teams are continually passing on the single track, and it becomes as smooth almost as a railway.
    Henry David Thoreau (1817–1862)

    Plot, rules, nor even poetry, are not half so great beauties in tragedy or comedy as a just imitation of nature, of character, of the passions and their operations in diversified situations.
    Horace Walpole (1717–1797)