Jacmel Airport - Facilities

Facilities

The airport was originally built to accommodate smaller commercial flight services, but not large aircraft.

Prior to the January 2010 earthquake there was no air traffic control service at the airstrip, and its ramp area could only accommodate five aircraft at a time. The maximum weight an aircraft could have and use the facility was 100,000 lbs. The runway was unlit and the airstrip lacked an instrument landing system, radar and other radio navigation aids –used for landings in poor weather. As such, it could normally only support good weather (VFR) daylight operations.

The airport also hosted the local UN MINUSTAH base.

On September 9, 2010, a new terminal building was inaugurated by Public Works, Transport and Communications Minister, M. Jacques Gabriel, as well as by the General Manager of the Autorité Aéroportuaire Nationale, M. Lionel Isaac. The runway had been resurfaced as well (asphalt, 1000 meters).

Read more about this topic:  Jacmel Airport

Famous quotes containing the word facilities:

    Marriage is good enough for the lower classes: they have facilities for desertion that are denied to us.
    George Bernard Shaw (1856–1950)

    I have always found that when men have exhausted their own resources, they fall back on “the intentions of the Creator.” But their platitudes have ceased to have any influence with those women who believe they have the same facilities for communication with the Divine mind as men have.
    Elizabeth Cady Stanton (1815–1902)