Hardware Platform Interface - Resource-level Capabilities

Resource-level Capabilities

In addition to a set of Management Instruments as described above, an HPI Resource may also provide up to four additional management capabilities. These Resource-level capabilities are essentially special Management Instruments, of which there may be at most one of each type supported by a Resource. Whether or not a particular Resource provides these miscellaneous capabilities and to which Entity they apply are described in a data record accessible by the HPI user for the Resource. A single Entity Path is defined in that record, so any of these capabilities, if present, will apply to the same Entity.

  • The resource-level Power Management capability acts as a specialized Control to turn power on or off the designated Entity.
  • The resource-level Reset capability acts as a specialized Control to cause a hard or soft reset operation on the designated Entity, or if supported, to hold the reset signal in an asserted state to prevent the Entity from operating.
  • The resource-level Load Management capability acts as a specialized Control that interfaces with the bootstrap program of the designated Entity to identify which operating system or other software should be loaded when a bootstrap operation is performed.
  • The Resource-level Configuration Management capability provides a method for an HPI user to direct the Resource to save or restore configuration information, such as sensor threshold levels to or from a persistent storage medium.

Read more about this topic:  Hardware Platform Interface

Famous quotes containing the word capabilities:

    “I maintain that I have been a Negro three times—a Negro baby, a Negro girl and a Negro woman. Still, if you have received no clear cut impression of what the Negro in America is like, then you are in the same place with me. There is no The Negro here. Our lives are so diversified, internal attitudes so varied, appearances and capabilities so different, that there is no possible classification so catholic that it will cover us all, except My people! My people!”
    —Zora Neale Hurston (1891–1960)