Hakodate Main Line - Basic Data

Basic Data

  • Operators
    • Hokkaido Railway Company (Category 1)
      • Hakodate - Ōnuma-Kōen - Otaru - Asahikawa: 423.1 km
      • Ōnuma - Oshima-Sawara - Mori, "Sawara Line": 35.3 km
      • Nanae - Ōnuma, "Fujishiro Line": Used by down (northbound) trains only
        Officially not recognized as a separate line
    • Japan Freight Railway Company ((Category 2))
      • Goryōkaku - Oshamambe: 108.9 km
      • Naebo - Asahikawa: 134.6 km
      • Ōnuma - Oshima-Sawara - Mori: 35.3 km
  • Gauge: 1,067 mm
  • Tracks:
    • Quadruple: Sapporo - Shiroishi
      Double for Hakodate Main Line, double for Chitose Line trains
    • Triple: Sōen - Sapporo
      Double for Hakodate Main Line, single for Sasshō Line trains
    • Double:
      • Hakodate - Nanae
      • Mori - Washinosu
      • Yamazaki - Kuroiwa
      • Kita-Toyotsu - Oshamambe
      • Otaru - Sōen
      • Shiroishi - Asahikawa
  • Electric supply:
    • 20,000 V AC:
      • Hakodate - Goryōkaku
      • Otaru - Asahikawa
    • Other sections are not electrified.
  • Railway signalling:
    • Oshamambe - Otaru: Special Automatic (Electronic Signal Verification); a simplified automatic system
    • Other sections: Automatic
  • Maximum speed at service: 130 km/h

Read more about this topic:  Hakodate Main Line

Famous quotes containing the words basic and/or data:

    For a novelist, a given historic situation is an anthropologic laboratory in which he explores his basic question: What is human existence?
    Milan Kundera (b. 1929)

    Mental health data from the 1950’s on middle-aged women showed them to be a particularly distressed group, vulnerable to depression and feelings of uselessness. This isn’t surprising. If society tells you that your main role is to be attractive to men and you are getting crow’s feet, and to be a mother to children and yours are leaving home, no wonder you are distressed.
    Grace Baruch (20th century)