Great Eastern Main Line - Proposed Developments

Proposed Developments

The Greater Anglia RUS, published in December 2007 outlines a number of developments intended for the Great Eastern route. Other proposals have been announced separately.

  • 68 additional carriages to provide longer trains will be introduced between December 2009 and December 2011.
  • Extension of platform 10A at Stratford to increase peak flow and capacity during the period 2009-2014.
  • Additional path on the Colchester, Chelmsford and Southend routes during the period 2009-2014.
  • A turn-back facility at Chadwell Heath during the period 2009-2014.
  • A new station at Great Blakenham as part of the SnOasis development near Ipswich, which received its final go-ahead on 6 November 2008.
  • In 2014 the 'Shenfield Metro' service will be absorbed managed by Crossrail and it will form part of its cross-London service from 2018.

Read more about this topic:  Great Eastern Main Line

Famous quotes containing the words proposed and/or developments:

    The proposed Constitution ... is, in strictness, neither a national nor a federal constitution; but a composition of both.
    James Madison (1751–1836)

    I don’t wanna live in a city where the only cultural advantage is that you can make a right turn on a red light.
    Freedom from labor itself is not new; it once belonged among the most firmly established privileges of the few. In this instance, it seems as though scientific progress and technical developments had been only taken advantage of to achieve something about which all former ages dreamed but which none had been able to realize.
    Hannah Arendt (1906–1975)