Golden Triangle Regional Airport - Facilities and Aircraft

Facilities and Aircraft

Golden Triangle Regional Airport covers an area of 1,000 acres (405 ha) at an elevation of 264 feet (80 m) above mean sea level. It has one runway designated 18/36 with an asphalt surface measuring 8,002 by 150 feet (2,439 x 46 m).

For the 12-month period ending December 31, 2011, the airport had 29,864 aircraft operations, an average of 81 per day: 50% general aviation, 41% military, and 9% air taxi. At that time there were 37 aircraft based at this airport: 68% single-engine, 16% multi-engine, 3% jet, and 14% helicopter.

Because of the projected growth, in the years since 2003 the airport has spent significant resources improving and upgrading the infrastructure. In 2003 a $1.6 million air traffic control tower was opened to maintain the safety of the flying operation and is manned under the FAA's Contract Tower Program. The runway was repaved and strengthened to take commercial aircraft up to a Boeing 757. Two additional parking ramps were constructed and the two remaining ramps were rehabilitated. The terminal has had minor renovations but a major expansion was completed in 2010. A runway expansion from 6,497' to 8,000' was completed in June 2011.

Read more about this topic:  Golden Triangle Regional Airport

Famous quotes containing the word facilities:

    I have always found that when men have exhausted their own resources, they fall back on “the intentions of the Creator.” But their platitudes have ceased to have any influence with those women who believe they have the same facilities for communication with the Divine mind as men have.
    Elizabeth Cady Stanton (1815–1902)