Site Challenges
Its construction commenced in 1994, and it was completed in 1998. Significant challenges were posed in the formation of the 21,000 m² site due to its terraced land form as well as its narrow land shape. The tunnels for the Kwun Tong Line of the MTR run through the full length of the site.
During the construction of the building with 4 basement levels, 460,000 m³ of earth had to be shifted.
Read more about this topic: Festival Walk
Famous quotes containing the words site and/or challenges:
“The site of the true bottomless financial pit is the toy store. Its amazing how much a few pieces of plastic and paper will sell for if the purchasers are parents or grandparent, especially when the manufacturers claim their product improves a childs intellectual or physical development.”
—Lawrence Kutner (20th century)
“The approval of the public is to be avoided like the plague. It is absolutely essential to keep the public from entering if one wishes to avoid confusion. I must add that the public must be kept panting in expectation at the gate by a system of challenges and provocations.”
—André Breton (18961966)