Operation
The sites are run by and gas is produced by BP, Gasco and Centrica Storage Ltd. Gas can be transferred to and from the Centrica Storage plant at Easington dependant on grid demand. The control of the BP sites takes place at the Dimlington site, and conditioning of the gas also takes place there. The function that is at the BP Easington site is the connection to the National Transmission System. BP Easington used to compress gas as well, but from 2007-9, the construction of the £125m Onshore Compression and Terminal Integration Project (OCTIP) situated all compression and processing from the gas fields at the Dimlington site. As part of the facility, two RB211-GT61 gas turbines, built by Rolls Royce Energy Systems in Mount Vernon, Ohio, were installed in a £12.7m contract.
Read more about this topic: Easington Gas Terminal
Famous quotes containing the word operation:
“It requires a surgical operation to get a joke well into a Scotch understanding. The only idea of wit, or rather that inferior variety of the electric talent which prevails occasionally in the North, and which, under the name of Wut, is so infinitely distressing to people of good taste, is laughing immoderately at stated intervals.”
—Sydney Smith (17711845)
“Human knowledge and human power meet in one; for where the cause is not known the effect cannot be produced. Nature to be commanded must be obeyed; and that which in contemplation is as the cause is in operation as the rule.”
—Francis Bacon (15601626)
“An absolute can only be given in an intuition, while all the rest has to do with analysis. We call intuition here the sympathy by which one is transported into the interior of an object in order to coincide with what there is unique and consequently inexpressible in it. Analysis, on the contrary, is the operation which reduces the object to elements already known.”
—Henri Bergson (18591941)