Easington Gas Terminal - Operation

Operation

The sites are run by and gas is produced by BP, Gasco and Centrica Storage Ltd. Gas can be transferred to and from the Centrica Storage plant at Easington dependant on grid demand. The control of the BP sites takes place at the Dimlington site, and conditioning of the gas also takes place there. The function that is at the BP Easington site is the connection to the National Transmission System. BP Easington used to compress gas as well, but from 2007-9, the construction of the £125m Onshore Compression and Terminal Integration Project (OCTIP) situated all compression and processing from the gas fields at the Dimlington site. As part of the facility, two RB211-GT61 gas turbines, built by Rolls Royce Energy Systems in Mount Vernon, Ohio, were installed in a £12.7m contract.

Read more about this topic:  Easington Gas Terminal

Famous quotes containing the word operation:

    It is critical vision alone which can mitigate the unimpeded operation of the automatic.
    Marshall McLuhan (1911–1980)

    Human knowledge and human power meet in one; for where the cause is not known the effect cannot be produced. Nature to be commanded must be obeyed; and that which in contemplation is as the cause is in operation as the rule.
    Francis Bacon (1560–1626)

    You may read any quantity of books, and you may almost as ignorant as you were at starting, if you don’t have, at the back of your minds, the change for words in definite images which can only be acquired through the operation of your observing faculties on the phenomena of nature.
    Thomas Henry Huxley (1825–95)