Construction and Operation
The facility was constructed in stages between 1981–1993 by the provincial Crown corporation, Ontario Hydro. Unit 2 was brought online in 1990, Unit 1 in 1992, and Units 3 and 4 in 1993. In April 1999 Ontario Hydro was split into 5 component Crown corporations with Ontario Power Generation (OPG) taking over all electrical generating stations and which continues to operate the Darlington station. The Darlington reactors have been among the best performing in OPG's CANDU fleet, including a top year in 2008 in which the plant achieved a combined 94.5% capacity factor.
The reactors are named Darlington 1 through Darlington 4.
Read more about this topic: Darlington Nuclear Generating Station
Famous quotes containing the words construction and/or operation:
“Striving toward a goal puts a more pleasing construction on our advance toward death.”
—Mason Cooley (b. 1927)
“Human knowledge and human power meet in one; for where the cause is not known the effect cannot be produced. Nature to be commanded must be obeyed; and that which in contemplation is as the cause is in operation as the rule.”
—Francis Bacon (15601626)