Daphne Civic Center - History

History

First proposed in April 1996 at an estimated cost of $4.2 million, plans to borrow money to build the Daphne Civic Center were approved in May 1997 with a $4.5 million budget attached. Upon completion, the center ultimately cost $6 million to construct and equip.

Scheduled for completion in September 1999, the center opened to the public on December 2, 1999 for Christmas by the Bay, the Baldwin County Humane Society's annual holiday fund-raiser. The building's formal grand opening ceremony was held in January 2000.

Read more about this topic:  Daphne Civic Center

Famous quotes containing the word history:

    “... the history of the race, from infancy through its stages of barbarism, heathenism, civilization, and Christianity, is a process of suffering, as the lower principles of humanity are gradually subjected to the higher.”
    —Catherine E. Beecher (1800–1878)

    “What we call National-Socialism is the poisonous perversion of ideas which have a long history in German intellectual life.”
    —Thomas Mann (1875–1955)

    “The steps toward the emancipation of women are first intellectual, then industrial, lastly legal and political. Great strides in the first two of these stages already have been made of millions of women who do not yet perceive that it is surely carrying them towards the last.”
    —Ellen Battelle Dietrick, U.S. suffragist. As quoted in History of Woman Suffrage, vol. 4, ch. 13, by Susan B. Anthony and Ida Husted Harper (1902)