Dagenham Wind Turbines - Planning and Building

Planning and Building

One turbine is located in the London Borough of Barking and Dagenham, (Turbine 1) the second in the Hornchurch Marshes area of the London Borough of Havering (Turbine 2). Planning consent was received from both boroughs. The Mayor of London gave approval for the project in August 2003.

The turbines were constructed by the Ecotricity green energy company. Planning consent was also given for a third 65 m high turbine (Turbine 3) in Havering, with a viewing platform which was not constructed. The planned operating date for the third wind turbine was by the first quarter of 2009, and it was eventually installed in 2011.

Read more about this topic:  Dagenham Wind Turbines

Famous quotes containing the words planning and, planning and/or building:

    ...A shadow now occasionally crossed my simple, sanguine, and life enjoying mind, a notion that I was never really going to accomplish those powerful literary works which would blow a noble trumpet to social generosity and noblesse oblige before the world. What? should I find myself always planning and never achieving ... a richly complicated and yet firmly unified novel?
    Sarah N. Cleghorn (1876–1959)

    Judge Bedford: Planning on having children?
    David: Naturally.
    Judge Bedford: Good, then I know what to get you for a wedding present.
    David: Yeah? What’s that?
    Judge Bedford: A vasectomy.
    Dale Launer (b. 1953)

    Travelling is the ruin of all happiness! There’s no looking at a building here after seeing Italy.
    Fanny Burney (1752–1840)