When proposals to build the SkyTrain Canada Line subway (formerly known as the Richmond-Airport-Vancouver or RAV Line) along Cambie Street first emerged, they were heavily protested by residents and business owners who wanted to keep the street as a heritage boulevard. They argued in favour of using the existing Arbutus Street rail corridor instead.

Once the decision was made to use the Cambie alignment for the Canada Line anyway, residents along the corridor successfully persuaded authorities to put the rail line in a tunnel instead of running it as a surface route, and to dig the tunnel using a tunnel boring machine. However, due to cost concerns, the winning bidder decided to use a cut-and-cover method to build the tunnel - which introduced disruption to traffic and business along the corridor during the construction. As such, even though it cost less than using a tunnel boring machine, the plan drew heavy criticism from area residents and businesses.

Gregor Robertson, who later became the mayor of Vancouver, was a strong supporter of Cambie Street merchants and spoke regularly about hardships from the Canada Line construction. He called the handling of the rail line construction an "injustice."

On March 23, 2009 Robertson testified in a lawsuit brought by the Cambie Street merchant Susan Heyes, owner of Hazel & Co., in the B.C. Supreme Court regarding damage to her business from the construction, a lawsuit for which she was awarded $600,000 by the B.C. Supreme Court due in part to the fact that there was insufficient action to mitigate the effects of Canada Line construction on Cambie Street merchants. On the Canada Line opening day of August 17, 2009 Robertson said Greater Vancouver needed more rapid transit but the Canada Line was a "great start" and that he was a "Johnny-come-lately" to the project.

During the years 2006 to 2009 portions of the street south of False Creek were closed to traffic to allow for construction of the line. The cut-and-cover tunnel runs underneath the east side of the street for most of its route. South of West 63rd Avenue, the line emerges from the tunnel and runs on an elevated structure across the Fraser River.

Read more about this topic:  Cambie Street

Famous quotes containing the words canada, line and/or construction:

    I fear that I have not got much to say about Canada, not having seen much; what I got by going to Canada was a cold.
    Henry David Thoreau (1817–1862)

    A line in long array, where they wind betwixt green islands;
    They take a serpentine course—their arms flash in the sun—hark to the musical clank;
    Walt Whitman (1819–1892)

    There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.
    John Dewey (1859–1952)