Coal getting is known in the area from as early as 1376 but large-scale development was left until the tenure of Francis Egerton, 3rd Duke of Bridgewater.

The first drainage sough was cut into the Earl of Bridgewater's estates in Worsley on the Manchester Coalfield in 1729 under the auspices of John Massey, the mines agent of Scroop Egerton, the 4th Earl and 1st Duke of Bridgewater. This sough was sited to provide drainage for as many mine works as possible in order to make its construction economic. The sough was 1,100 yards (1,000 m) long with 600 yards (550 m) underground. Water in the coal measures worked above the sough drained into it and deeper coal seams benefited because water needed to be lifted only to the sough not to the surface. This solution to the water drainage problem was successful and extensions of 450 yards (410 m) proceeded to allow other coal seams to be drained.

Read more about this topic:  Worsley Navigable Levels

Famous quotes containing the word beginning:

    It was a marvel, an enigma in abolition latitudes, that the slaves did not rise en-masse, at the beginning of hostilities.
    Rebecca Latimer Felton (1835–1930)