Historical Background
The passing of the Wisbech, St. Ives and Cambridge Junction Railway Act 1846 (c.ccclvi) authorised the construction of two lines from March railway station: a 7.8-mile line to Wisbech which was reached by an almost straight north-easterly route across The Fens and a line south to the market town of St Ives. The double-track line to Wisbech was the first to open on 3 May 1847 followed by the St Ives line nine months later. The Wisbech line was taken over before completion by the Eastern Counties Railway and then by the Great Eastern Railway in 1862. Coldham was the only intermediate station between March and Wisbech, the latter being served by a new station constructed in the town centre and named "Wisbeach". It was to last until 1863 when it was resited south and later renamed Wisbech East upon nationalisation of the railways to distinguish it from the Midland and Great Northern's Wisbech North station. The railway development in the area was completed in March 1848 with the opening of a single-track 9.5 mile extension from Wisbeach to Watlington Junction.
Although not recommended for closure in the Beeching Report of 1963, the series of lines around Wisbech were gradually closed from the 1960s onwards. Coldham station was the first to be closed in 1966, followed by the March to Watlington and March to Wisbech branches in September 1968. The line between March and Wisbech remained, however, open to freight traffic - namely steel coil for the Metal Box factory and occasional parcels, coal and pet food trains from Nestle Purina until Summer 2000. The line was singled in March 1972 with the lifting of the down rails.
Cambridgeshire County Council considered re-opening the line between March and Wisbech to passengers in 1990, however a quote from British Rail of £1.36 million for the upgrading of the then operational freight line, coupled to an annual £200,000 operating charge, meant that this proposal was dropped.
Campaigning group Railfuture have made an uncosted proposal that that line should be restored as a commuter route, providing an hourly service to Cambridge, with a maximum suggested journey time of 35 minutes. They compare their case for restoring the service to the completed Stirling-Alloa-Kincardine rail link.
Read more about this topic: Wisbech And March Bramley Line
Famous quotes containing the words historical and/or background:
“By contrast with history, evolution is an unconscious process. Another, and perhaps a better way of putting it would be to say that evolution is a natural process, history a human one.... Insofar as we treat man as a part of naturefor instance in a biological survey of evolutionwe are precisely not treating him as a historical being. As a historically developing being, he is set over against nature, both as a knower and as a doer.”
—Owen Barfield (b. 1898)
“... every experience in life enriches ones background and should teach valuable lessons.”
—Mary Barnett Gilson (1877?)