Wind Power in Wyoming

Wind Power In Wyoming

Wyoming has one of the highest wind power potentials of any United States (U.S.) state. Wyoming's geography of high-altitude prairies and broad ridges makes the state an ideal site for the development of wind resources. Other factors that positively affect Wyoming's wind power development potential are the high percentage of land owned by the federal government, the low population density, and the historical importance of the mining and energy sectors to the state's economy. A chief disadvantage to large-scale wind power production in the state are Wyoming's relative distance from major population centers, and the lack of transmission capacity.

Wyoming's first wind farm was the Foote Creek Rim wind project located near Arlington. This 85 MW wind farm, completed in 1999, is in one of the windiest locations in the state, and due to average winds of 25 mph it has a capacity factor of 43% of peak output annually, which is higher than most wind farms. In 2008 the state's largest wind farm was the 144 MW Wyoming Wind Energy Center, located in Uinta County, near Evanston.

Wyoming Wind Generation Capacity by Year
Megawatts of Installed Generating Capacity
since 2001

In November 2008, the New York Times reported a land rush in Wyoming in anticipation of future wind power development projects. Citizens and land-owners in Wyoming have formed numerous "wind associations" in the hopes of collectively bargaining for higher compensation for the use of their land in wind power production and transmission projects. Most of these associations are located in the wind-power dense counties of southeastern Wyoming, including Platte, Converse, Goshen and Laramie counties.

The Chokecherry/ Sierra Madre Wind Project comprises the largest commercial wind generation facility proposed in North America. Power Company of Wyoming has applied to the BLM to build approximately 1,000 wind turbines in an area located south of Rawlins, Wyoming, in Carbon County. The project is proposed to generate 2,000 to 3,000 megawatts (MW) of electricity and construction may take 3–4 years with a project life estimate of 30 years.

The White Mountain Wind Energy Project is a proposed 360 MW wind farm which would result in the construction of up to 240 turbines on White Mountain just northwest of Rock Springs.

Energy Transportation Inc., headquartered in Casper, is a well known logistics firm that transports overweight and outsized components used in the wind power industry.

Read more about Wind Power In Wyoming:  Wind Generation

Famous quotes containing the words wind, power and/or wyoming:

    This girl borrowed no dim light of a star
    Nor ever night held her in a dark mesh,
    A slim bloom she stood of the first larkspur,
    A wind of spring fluttered in her white flesh.
    Allen Tate (1899–1979)

    The power men possess to annoy me I give them by a weak curiosity. No man can come near me but through my act.
    Ralph Waldo Emerson (1803–1882)

    The admission of the States of Wyoming and Idaho to the Union are events full of interest and congratulation, not only to the people of those States now happily endowed with a full participation in our privileges and responsibilities, but to all our people. Another belt of States stretches from the Atlantic to the Pacific.
    Benjamin Harrison (1833–1901)