William Morris Gallery - Redevelopment

Redevelopment

In 2007, the museum faced a closure threat after its opening hours were cut back as a cost-cutting exercise, breaking a stipulation of gifts by Sir Frank Brangwyn, that works should be on view for a minimum amount of time weekly. Campaigners against the cuts included former Culture Secretary Chris Smith. Subsequently a major redevelopment was carried out.

The William Morris Gallery is owned and managed by Waltham Forest Council. In March 2009 the Heritage Lottery Fund awarded the gallery £80,000 to enable detailed proposals to be developed. In Autumn 2010 this proposal was successful in securing round-two funding of £1.523 million from the Heritage Lottery Fund, which was matched with £1.5 million from the London Borough of Waltham Forest. Further funding was secured from charitable trusts and foundations, notably the Friends of the William Morris Gallery, and through an ongoing public fundraising campaign. Redevelopment of the building and collections finally started in 2011 and after just over a year’s closure, reopened on 2 August 2012. For the first month, Grayson Perry's fifteen-metre long Walthamstow Tapestry was on display.

The redevelopment of Water House and was designed by architects and exhibition designers Pringle Richards Sharratt. A new wing, designed to sit comfortably next the the early Georgian architecture of William Morris’s house, succeeds in doing so by using similar details - handmade brick with sash windows and gauged brick arches - in a contrasting red brick. The new space houses a new gallery space for temporary exhibitions, toilets and a cafe with a balcony overlooking the gardens to the rear. The permanent displays and educational areas were completely rearranged, and the project also provides a learning and research centre on the top floor, offices in the basement. New learning programmes and a dedicated website were developed alongside the physical changes.

Read more about this topic:  William Morris Gallery