History
The original segment of the parkway was envisioned as a 127-mile (204 km) toll road extending from Elizabethtown to Princeton. The bonds were issued in 1961 and construction wrapped up on the original 127.19 miles (204.69 km) in December 1963 at a cost of $108,548,062. In 1968, construction wrapped up on a 6.60-mile (10.62 km) extension of the Western Kentucky Parkway from Princeton to Interstate 24 in Eddyville coming in at a cost of $5,554,468. The extension was originally proposed to be 10.30 miles (16.58 km) but only 6.60 miles (10.62 km) were constructed, possibly due to a design realignment of Interstate 24 near Eddyville.
The parkway was originally a toll road, as were all Kentucky parkways. State law requires that toll collection ceases when enough tolls are collected to pay off the parkway's construction bonds; that occurred in 1987. It is constructed similar to the Interstate Highway system, though sections do not measure up to current Interstate standards.
Read more about this topic: Western Kentucky Parkway
Famous quotes containing the word history:
“The history of any nation follows an undulatory course. In the trough of the wave we find more or less complete anarchy; but the crest is not more or less complete Utopia, but only, at best, a tolerably humane, partially free and fairly just society that invariably carries within itself the seeds of its own decadence.”
—Aldous Huxley (18941963)
“The history of all previous societies has been the history of class struggles.”
—Karl Marx (18181883)
“They are a sort of post-house,where the Fates
Change horses, making history change its tune,
Then spur away oer empires and oer states,
Leaving at last not much besides chronology,
Excepting the post-obits of theology.”
—George Gordon Noel Byron (17881824)