History
The four-lane portion of VT 279 between VT 67A and US 7 was built in the early 1970s and designated VT 67A Connector in 1974. However, construction did not begin on the remainder of the route west of VT 67A (including the short continuation into Hoosick, New York) until the early 2000s. Work on the bypass concluded with the opening of VT 279 on October 12, 2004. The number "279" was chosen because it provides a bypass for both US 7 and VT 9.
Construction on an extension of VT 279 southeast to VT 9 began in July 2007. The highway was built as a two-lane undivided roadway, similar to that constructed between Hoosick and Bennington. It was officially opened on August 30, 2012, and cost roughly $70 million to build. Construction plans for the northern segment called for the existing interchange between US 7 and VT 279 to be reconfigured to accommodate a welcome center located within the exit.
Read more about this topic: Vermont Route 279
Famous quotes containing the word history:
“It takes a great deal of history to produce a little literature.”
—Henry James (18431916)
“The best history is but like the art of Rembrandt; it casts a vivid light on certain selected causes, on those which were best and greatest; it leaves all the rest in shadow and unseen.”
—Walter Bagehot (18261877)
“In all history no class has been enfranchised without some selfish motive underlying. If to-day we could prove to Republicans or Democrats that every woman would vote for their party, we should be enfranchised.”
—Carrie Chapman Catt (18591947)