USS Sturgeon (SSN-637) - Construction and Commissioning

Construction and Commissioning

The contract to build Sturgeon was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 30 November 1961 and her keel was laid down there on 10 August 1963. She was launched on 26 February 1966, sponsored by Mrs. Everett Dirkson, the wife of United States Senator Everett Dirksen (1896–1969) of Illinois, and commissioned on 3 March 1967, with Commander Curtis B. Shellman, Jr., in command.

Read more about this topic:  USS Sturgeon (SSN-637)

Famous quotes containing the word construction:

    There’s no art
    To find the mind’s construction in the face:
    He was a gentleman on whom I built
    An absolute trust.
    William Shakespeare (1564–1616)