Tunnel and Reservoir Plan

The Tunnel and Reservoir Plan (abbreviated TARP and more commonly known as the Deep Tunnel Project or the Chicago Deep Tunnel) is a large civil engineering project that aims to reduce flooding in the metropolitan Chicago area, and to reduce the harmful effects of flushing raw sewage into Lake Michigan by diverting storm water and sewage into temporary holding reservoirs. The megaproject is one of the largest civil engineering projects ever undertaken in terms of scope, cost and timeframe. Commissioned in the mid-1970s, the project is managed by the Metropolitan Water Reclamation District of Greater Chicago. Completion of the system is not anticipated until 2029, but substantial portions of the system have already opened and are currently operational. Across 30 years of construction, over $3 billion has been spent on the project.

Read more about Tunnel And Reservoir Plan:  Status, Effects, Sources

Famous quotes containing the words tunnel, reservoir and/or plan:

    It is the light
    At the end of the tunnel as it might be seen
    By him looking out somberly at the shower,
    The picture of hope a dying man might turn away from,
    Realizing that hope is something else, something concrete
    You can’t have.
    John Ashbery (b. 1927)

    It’s very expressive of myself. I just lump everything in a great heap which I have labeled “the past,” and, having thus emptied this deep reservoir that was once myself, I am ready to continue.
    Zelda Fitzgerald (1900–1948)

    Fix’d like a plan on his peculiar spot,
    To draw nutrition, propagate, and rot.
    Alexander Pope (1688–1744)