Tropical Storm Thelma - Aftermath

Aftermath

"It looked like it was a Nazi camp. Children and old people were piled on top of each other."

Cebu Provincial Governor Lito Osmena

Initially, it took more than 24 hours for word of the level of devastation to reach officials in Manila as communications across Leyte were largely destroyed. By November 7, search and rescue operations were underway across Leyte and Negros Occidental. The first shipment of relief supplies, consisting of food rations, rice, sardines, and used clothing, was to be shipped from Cebu later that day. On November 8, Philippine President Corazon Aquino declared all of Leyte a disaster area. A Philippine Navy vessel set out with heavy earth-moving machinery and the Philippine Air Force deployed aircraft to assist in rescue efforts. Relief efforts in Ormoc City were hampered by a lack of clear roads and fuel. Amateur radio reports stated that an AC-130 was able to land at a local airport but materials had to be moved by helicopter from there since roads were blocked. Relief efforts were also hampered by continuing rains and the rough terrain of the affected region. By November 11, approximately 8,300 families had been rescued and another 7,521 were evacuated from affected regions.

Supply distribution centers were established in Ormoc, providing residents with food, water, and materials, by November 11. People were given a can of sardines and 1 kg (2.2 lb) of rice at these centers. These centers were only able to operate in daylight though due to a lack of fuel and transportation. Water was supplied in limited quantities from Cebu. Medical and sanitation teams were deployed throughout the province, with many coming from surrounding areas. Residents searched through debris for lumber to construct makeshift coffins while others stacked bodies to be picked up by wheelbarrows or trucks. Officials had difficulty determining how to best deal with mass casualties as bodies lay across the Ormoc region. Many were found in the coastal barangays of Linao, Camp Downes, and Bantigue as well as the Ormoc pier. In order to prevent the spread of disease, mass graves were dug, with 700 bodies buried on November 8. Dump trucks were used to transport the dead to these sites as quickly as possible. As decomposition set in, residents stated that " putrid smell was unbearable." Even months after the storm, bodies were occasionally discovered, some found in drainage systems. By November 10, four navy vessels were searching debris in the waters near Ormoc for bodies; 16 were recovered that day with more believed to be submerged in the bay. Roads surrounding the city were finally cleared by November 12; however, electricity remained out. With the deployment of medical teams from Japan, hospitals in the region returned to full capacity. By November 22, electricity and water had been 70 percent and 60 percent restored, respectively. The emergency phase of assistance ended on November 29 and coordination of disaster relief was returned to the Philippines. By that time, national aid to Ormoc reached $1.1 million, with more than half coming from a presidential grant.

On November 7, despite no official appeal for international aid, the governments of France and the United States provided $34,783 and $25,000 in funds. The request for assistance came the following day, with the Philippines requesting food, water, medicine, emergency supplies, and heavy machinery. A team from the United Nations Disaster Relief Organization, specializing with relief coordination and flood management, was also sent. The Red Cross appealed for $418,000 to support 15,000 families for one month. A cash grant of $17,300 from the United Kingdom was received on November 8. Two United States Air Force AC-130s from Subic bay naval base flew to Cebu carrying ready-to-eat meals. International funding reached $2.5 million on November 12, with grants of $1.05 million, $1 million, $188,000 from the Netherlands, Japan, and Australia respectively. Additionally, the United States provided 55,000 packages of food rations. This total nearly doubled two days later with grants from the United Nations Development Programme, World Food Programme, World Vision International, Médecins Sans Frontières, Caritas, various branches of the Red Cross, and the governments of Canada, New Zealand. Ultimately, approximately $5.8 million was provided in international assistance from 13 nations, the United Nations, the Red Cross, and various non-governmental organizations.

Isle Verde, where approximately 2,300 people were killed, was declared uninhabitable by officials; however, residents still returned to the area due to a need for land. Eventually, signs that used to warn people not to stay on the islet were eventually taken down and people were no longer warned not to live there. A resettlement community was constructed months later, with plans to house 912 of the 2,668 families that needed to be moved from the area. Those that were not moved were left on Isle Verde despite orders not to stay there. Another resettlement project for 700 families was planned at the cost of $1 million.

The sheer magnitude of the flood event in the Anilao–Malbasag watershed made the region more vulnerable to future flood events. Hillsides became more unstable and the rivers themselves were clogged with debris, raising their water levels and widening their banks. In a post-disaster assessment in October 1992, it was stated that swift cooperation of all agencies from local to governmental was necessary to prevent tragedies of similar caliber in the future. It was urged that residents still living along the river banks be relocated to safer areas; however, by the time of the report, people had already begun repopulating the area. As a way of avoiding similar breaching of the riverbank, it was suggested that the two rivers be dredged and possibly re-channeled. Several points were also brought up about rehabilitating the landscape of the watershed: reforestation, contoured farming, and redesigning of plantations to better retain rainwater. Long-term rehabilitation of the watershed was deemed necessary in addition to repairing infrastructure in Ormoc.

In 1993, following a request by the Philippine Government, the Japan International Cooperation Agency conducted as study on flood control for Ormoc and other cities across the country. In 1998, a ₱800 million ($20.6 million USD) construction project for flood mitigation was approved and later completed in 2001. That year, Tropical Depression Auring caused flooding of similar magnitude to Thelma; however, the waters were properly diverted to the sea. A sculpture and monument to the victims, designed by architect Maribeth Ebcas and artist Florence Cinco respectively, called "Gift of Life" was constructed on a 1.3 km2 (0.8 mi2) plot of land. It was designed to also depict a need to respect nature and be a message of hope for residents in Ormoc.

Due to the catastrophic loss of life caused by the storm, the name Thelma was retired and replaced with Ulding.

Read more about this topic:  Tropical Storm Thelma

Famous quotes containing the word aftermath:

    The aftermath of joy is not usually more joy.
    Mason Cooley (b. 1927)