Trent and Mersey Canal - History

History

As its name implies, the Trent and Mersey canal (T & M) was built to link the River Trent at Derwent Mouth (in Derbyshire) to the River Mersey. The second connection is made via the Bridgewater Canal, which it joins at Preston Brook in Cheshire. Note that although mileposts measure the distance to Preston Brook and Shardlow, Derwent mouth is a mile or so beyond Shardlow.

The plan of a canal connection from the Mersey to the Trent ("The Grand Trunk") came from canal engineer James Brindley. It was authorised by an Act of Parliament in 1766 and the first sod was cut by Josiah Wedgwood in July that year at Middleport. In 1777, the canal was completed, including more than 70 locks and five tunnels, with the company headquarters in Stone.

The first known idea to build a canal between the River Mersey and the River Trent was put forward in 1755, though no action was taken at that time. In 1760, Lord Gower, a local businessman, and brother-in-law of the Duke of Bridgewater drew up a plan for the Trent and Mersey Canal. If his plan had gone ahead, this would have been the first canal ever constructed in England. James Brindley, the engineer behind many of the canals in England, did his first canal work on the Trent and Mersey, though his first job in charge of construction was on the Bridgewater Canal.

In 1761, Josiah Wedgwood showed an interest in the construction of a canal through Stoke-on-Trent, the location of his Wedgwood pottery, as his business depended on the safe and smooth transport of his pots. By road, pots were liable to be damaged and broken. A canal near to his factory would provide fast and safe transport for his wares. Wedgwood’s plan was not to connect the two rivers by canal, but to connect the potteries to the River Mersey. “As a burgeoning industrialist, Wedgwood was a major backer of the Trent and Mersey Canal dug between the River Trent and River Mersey….” (A quote taken from a short Biography of Josiah Wedgwood)

There was much debate about possible routes that a canal could take. Coal merchants in Liverpool felt threatened about a canal that could bring coal in from Cheshire. The owners of the River Weaver Navigation were also not happy about the proposals, because the route would almost parallel that of the river. Yet another route was published, which much to the shock of Wedgwood, did not at all include the potteries.

Wedgwood, intent to have a waterway connection to his potteries, managed to send his proposal to parliament, with the help of two of his friends, Thomas Bentley, and Dr. Erasmus Darwin. John Gilbert’s plan for the “Grand Trunk” canal met opposition at the eastern end, where in Burton on Trent, the locals objected to the canal passing parallel to the upper Trent navigation. In 1764, Wedgwood managed to convince Gilbert to include the Potteries in his route. In 1766, Gilbert's plan was authorised by an Act of Parliament. Later that year, “n July 26th a massive celebration was held in the Potteries where Josiah Wedgwood cut the first sod of soil. James Brindley was employed as engineer and work got under way.” (A quote from Canals, Routes and Roots, The Trent and Mersey Canal, by Peter Hardcastle)

Six years before the complete opening of the Trent and Mersey Canal in 1771, Wedgwood built the factory village of Etruria on the outskirts of Stoke-on-Trent, close to the canal. By this time, much of the canal had been built towards Preston Brook. The only obstacle that still had to be tackled by the canal company was the hill at Kidsgrove, through which a tunnel was being dug. Up until 1777, pots had to be carried on the short journey from Etruria, over the top of Kidsgrove Hill, and to the other side, where the canal had been constructed to Preston Brook.

On January 15, 1847 the Trent and Mersey Canal was acquired by the North Staffordshire Railway Company (NSR). This was done to stifle the opposition of the Canal Company to the creation of the Railway Company. In particular, the NSR had plans for a railway from Stoke-on-Trent to Liverpool, however, this line was abandoned due to opposition from other rail interests.

The Grand Trunk was a part of a larger scheme of Brindley's to link the four main rivers of England (Trent, Mersey, Severn and Thames) in a project known as the "Grand Cross". The Trent and Mersey Canal provided the northern arm of the cross (to the Mersey), and the eastern arm (to the Trent). It also provided the central hub of the cross, between Great Haywood, and Fradley Junctions. The western arm, to the Severn, was built as the Staffordshire and Worcestershire Canal, whilst the southern arm (to the Thames) traversed the Coventry and Oxford Canals.

Read more about this topic:  Trent And Mersey Canal

Famous quotes containing the word history:

    There has never been in history another such culture as the Western civilization M a culture which has practiced the belief that the physical and social environment of man is subject to rational manipulation and that history is subject to the will and action of man; whereas central to the traditional cultures of the rivals of Western civilization, those of Africa and Asia, is a belief that it is environment that dominates man.
    Ishmael Reed (b. 1938)

    Don’t give your opinions about Art and the Purpose of Life. They are of little interest and, anyway, you can’t express them. Don’t analyse yourself. Give the relevant facts and let your readers make their own judgments. Stick to your story. It is not the most important subject in history but it is one about which you are uniquely qualified to speak.
    Evelyn Waugh (1903–1966)

    History ... is, indeed, little more than the register of the crimes, follies, and misfortunes of mankind.
    But what experience and history teach is this—that peoples and governments have never learned anything from history, or acted on principles deduced from it.
    Georg Wilhelm Friedrich Hegel (1770–1831)