The pipeline will be 1,420 millimetres (56 in) in diameter with a working pressure of 100 standard atmospheres (10,000 kPa). The initial capacity will be 27 billion cubic metres (950 billion cubic feet) of natural gas per year of which 2 billion cubic metres (71 billion cubic feet) will be provided to Afghanistan and 12.5 billion cubic metres (440 billion cubic feet) to each Pakistan and India. Later the capacity will increase to 33 billion cubic metres (1.2 trillion cubic feet). Six compressor stations would be constructed along the pipeline. The pipeline was expected to be operational by 2014.

The pipeline's cost is estimated at US$7.6 billion. The Asian Development Bank has played a leading role in coordinating and facilitating the TAPI negotiation process. The four TAPI nations must still attract commercial partners to build, finance, and operate the pipeline, estimated in 2008 to cost at least $7.6 billion.

Read more about this topic:  Trans-Afghanistan Pipeline

Famous quotes containing the words technical and/or features:

    I rather think the cinema will die. Look at the energy being exerted to revive it—yesterday it was color, today three dimensions. I don’t give it forty years more. Witness the decline of conversation. Only the Irish have remained incomparable conversationalists, maybe because technical progress has passed them by.
    Orson Welles (1915–1984)

    These, then, will be some of the features of democracy ... it will be, in all likelihood, an agreeable, lawless, particolored commonwealth, dealing with all alike on a footing of equality, whether they be really equal or not.
    Plato (c. 427–347 B.C.)