Tom Pudding - Mechanisation

Mechanisation

The key to the success of the system was the mechanisation of the transshipments. In the docks at Goole, the large boat hoists could lift the Puddings and discharge them directly into sea going ships which exported the coal to all parts of the world. One of the five hoists has been preserved.

At the colliery the containers were mounted on waggons so that they could be taken into the heart of the colliery and the coal loaded directly from the pit head. In 1891, an inclined plane was installed at Stanley Ferry to connect the colliery directly to the canal. The 15-foot (4.6 m) wide compartments carrying 35 tons of coal were balanced on standard gauge railway wagons. Despite the precarious nature of this operation, no accidents were recorded. Because of the success of the system, by 1913 there were over 1,000 Tom Puddings in use and they were transporting 1,500,000 long tons (1,700,000 short tons; 1,500,000 t) of coal per year, which compares well with Warde-Aldam's original estimate of 45,000 tons per year.

A similar system was developed when the Kellingley Colliery opened at Knottingley. The Hargreave barge system was used to transport coal to the power station at Ferrybridge. The configuration consisted of three coal pans, each 56 by 9.25 feet (17 by 2.82 m) and 9.5 feet (2.9 m) deep, capable of carrying 170 long tons (190 short tons; 170 t) of coal. With a pusher tug at the rear, the train was 195 feet (59 m) long. The pans were, however, rigidly connected to each other, unlike Bartholomew's flexible arrangement.

Read more about this topic:  Tom Pudding