Timeline of The Eurofighter Typhoon - 2000s

2000s

  • 2000
    • 8 March - First export sale, 60 ordered and 30 options by Greece (but delayed, maybe cancelled).
    • 16 May - UK commits to MBDA Meteor BVRAAM, leading to significant benefits for export prospects.
    • 7 July - DA2 emerges from ten month stand down with latest avionics. Finished in black (see below) to reduce cosmetic effect of 490 pressure transducers applied to airframe.
  • 2002
    • 5 April - Instrumented Production Aircraft (IPA2) makes maiden flight from Turin.
    • 11 April - IPA 3 makes maiden flight from EADS Military Aircraft, Manching, Germany.
    • 15 April - IPA 1 makes maiden flight from BAE Warton.
    • 2 July - Austria announces acquisition of 24 Typhoon's, later reduced to 18.
    • 23 July - "Typhoon" name officially adopted as in-service name by four partner nations.
    • 21 November - DA6, flying out of Getafe crashes. Twin engine failure is blamed. .
  • 2003
    • 13 February - First Series Production Aircraft, GT001 flies from Manching. This is the first of Germany's 180 aircraft.
    • 14 February - In the space of just over an hour Italy's IT001 and Britain's BT001 make their maiden flights.
    • 17 February - Spain's ST001 flies from EADS Military Aircraft, Getafe, Spain.
    • 30 June - "Type Acceptance" signed, marking formal delivery of aircraft to the partner nations.
    • October - Integration of Meteor begins
  • 2004
    • 27 June - Two RAF Typhoon T1s depart UK for Singapore for marketing and training
    • 15 December - UK confirms purchase of second batch of 89 aircraft, the last nation to commit to "Tranche 2" production of 236 aircraft.
  • 2005
    • April - Singapore drops the Typhoon from its shortlist to supply the country's next generation fighter.
    • 16 December - The Aeronautica Militare Italiana (Italian Air Force) declares the Typhoon's Initial Operational Capability and sets it on Quick Reaction Alert from Grosseto Air Base.
    • 21 December - Saudi Arabia agrees a purchase of an unspecified number of Typhoons with the UK Ministry of Defence.
  • 2006
    • January - First AMI operational squadron formed
    • February - First operational mission undertaken by the Italian Air Force as Eurofighter Typhoon defends the airspace over Turin during the 2006 Winter Olympics
    • 31 March - First RAF operational squadron formed
    • August 18 - Announcement of Saudi Arabia signing a contract to buy 72 planes from the UK.
    • October 03 - 100th production aircraft delivered.
  • 2007
    • 12 July - The first Eurofighter for Austria is delivered to the Austrian Air Force
  • 2008
    • January 16 - The first Tranche 2 Eurofighter Typhoon has made its first flight.
    • October 22 - First flight of Typhoon in Royal Saudi Air Force livery.
  • 2009
    • June 12 - First Saudi Typhoons delivered.
    • November 25 - 200th Typhoon delivered.

Read more about this topic:  Timeline Of The Eurofighter Typhoon