The Titiokura/Te Waka Wind Farm was a wind farm project abandoned by Unison Networks and Roaring 40s. It was to be located adjacent to SH5 in the Te Pohue - Titiokura area, 35 km west of Napier, New Zealand.

Stage 1 of the project, Titiokura, gained resource consents in 2006 after an Environment Court appeal. This stage is for 15 wind turbines, producing up to 45 MW.

Stage 2, Te Waka, was to have a capacity of up to 102 MW from 34 turbines. The Environment Court declined this application, after the hearing was held in December 2008. A revised proposal was prepared, this was declined by the Environment Court in February 2009.

Early stages of the consent process were administered by the Hastings District Council and the Hawke's Bay Regional Council. Both stages of the wind farm are opposed by local iwi, Ngati Hineuru and Maungaharuru-Tangitu Society.

Read more about Te Waka Wind Farm:  See Also

Famous quotes containing the words wind and/or farm:

    He is the best sailor who can steer within the fewest points of the wind, and extract a motive power out of the greatest obstacles. Most begin to veer and tack as soon as the wind changes from aft, and as within the tropics it does not blow from all points of the compass, there are some harbors which they can never reach.
    Henry David Thoreau (1817–1862)

    Wind goes from farm to farm in wave on wave,
    But carries no cry of what is hoped to be.
    There may be little or much beyond the grave,
    But the strong are saying nothing until they see.
    Robert Frost (1874–1963)