Sweet Track - Construction

Construction

Built in 3807 or 3806 BC, the track was a walkway consisting mainly of planks of oak laid end-to-end, supported by crossed pegs of ash, oak and lime, driven into the underlying peat. The planks, which were up to 40 centimetres (16 in) wide, 3 metres (120 in) long and less than 5 centimetres (2.0 in) thick, were cut from trees up to 400 years old and 1 metre (39 in) in diameter, felled and split using only stone axes, wooden wedges and mallets. The length, straightness, and lack of forks or branches in the pegs suggest that they were taken from coppiced woodland. Longitudinal log rails up to 6.1 metres (20 ft) long and 7.6 centimetres (3.0 in) in diameter, made of mostly hazel and alder, were laid down and held in place with the pegs, which were driven at an angle across the rails and into the peat base of the bog. Notches were then cut into the planks to fit the pegs, and the planks were laid along the X shapes to form the walkway. In some places a second rail was placed on top of the first one to bring the plank above it level with the rest of the walkway. Some of the planks were then stabilised with slender, vertical wooden pegs driven through holes cut near the end of the planks and into the peat, and sometimes the clay, beneath. At the southern end of the construction smaller trees were used, and the planks split across the grain to utilise the full diameter of the trunk. Fragments of other tree species including holly, willow, poplar, dogwood, ivy, birch, and apple have also been found.

The wetland setting indicates that the track components must have arrived prefabricated, before being assembled on site, although the presence of wood chips and chopped branches indicates that some trimming was performed locally. The track was constructed from about 200,000 kilograms (440,000 lb) of timber, but Coles estimates that once the materials were transported to the site, ten men could have assembled it in one day.

The Sweet Track was used only for about ten years; rising water levels may have engulfed it, and therefore curtailed its use. The variety of objects found alongside the track suggest that it was in daily use as part of the farming life of the community. Since its discovery, it has been determined that parts of the Sweet Track were built along the route of an even earlier track, the Post Track, which was constructed thirty years earlier in 3838 BC.

Read more about this topic:  Sweet Track

Famous quotes containing the word construction:

    There’s no art
    To find the mind’s construction in the face:
    He was a gentleman on whom I built
    An absolute trust.
    William Shakespeare (1564–1616)

    There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.
    John Dewey (1859–1952)

    Striving toward a goal puts a more pleasing construction on our advance toward death.
    Mason Cooley (b. 1927)