STS-105 - Mission Highlights

Mission Highlights

The main purpose of STS-105 was the rotation of the International Space Station crew and the delivery of supplies utilizing the Italian-built Multi Purpose Logistics Module (MPLM) Leonardo on its second flight (STS-102, STS-105). The crew also performed two spacewalks and conducted scientific experiments. The Multi Purpose Logistics Module (MLPM) taken on STS-105 contained additional scientific racks, equipment and supplies. It is 6.4 meters long (21 ft) and 4.6 meters (15 ft) in diameter) and weighs over 4,082 kilograms (9,000 lb). An identical module named Raffaello has flown twice (STS-100 and, later, STS-108).

Aboard Leonardo were six Resupply Stowage Racks, four Resupply Stowage Platforms, and two new scientific experiment racks for the station's U.S. laboratory Destiny. The two new science racks (EXPRESS Racks 4 and 5) added further science capability to the station. EXPRESS stands for Expedite the Processing of Experiments to the Space Station. EXPRESS Rack 4 weighs 533 kilograms (1,180 lb) and EXPRESS Rack 5 weighs 544 kilograms (1,200 lb). The empty weight of each EXPRESS rack is about 356 kilograms (780 lb). EXPRESS Racks 1 and 2A were delivered aboard the Raffaello cargo module during STS-100/6A in April 2001. EXPRESS Rack 3 was brought to the station during STS-111 in 2002.

The Resupply Stowage Racks and Resupply Stowage Platforms were filled with Cargo Transfer Bags that contain equipment and supplies for the station. The six Resuppply Stowage Racks contained almost 1,451 kilograms (3,200 lb) of cargo and the four Resupply Stowage Platforms contained about 544 kilograms (1,200 lb) of cargo, not including the weight of the Cargo Transfer Bags, the foam packing around the cargo or the straps and fences that held the bags in place. The total weight of cargo, racks and packing material aboard Leonardo was just over 4,990 kilograms (11,000 lb). Total cargo weight was about 3,073 kilograms (6,770 lb).

Also carried in the payload bay was an Integrated Cargo Carrier (ICC) carrying the Early Ammonia Servicer and MISSE PECs 1 & 2.

Another payload onboard is the Materials International Space Station Experiments (MISSE). This project was a NASA/Langley Research Center-managed cooperative endeavor to fly materials and other types of space exposure experiments on the space station. The objective was to develop early, low-cost, non-intrusive opportunities to conduct critical space exposure tests of space materials and components planned for use on future spacecraft. Johnson Space Center, Marshall Space Flight Center, Glenn Research Center, the Materials Laboratory at the Air Force Research Laboratory and Boeing Phantom Works were participants with Langley in the project. The MISSE experiments were the first externally mounted experiments conducted on the ISS. The experiments were in four Passive Experiment Containers (PECs) that were initially developed and used for an experiment on Mir in 1996 during the Shuttle-Mir Program. The PECs were transported to Mir on STS-76. After an 18-month exposure in space, they were retrieved on STS-86. PECs are suitcase-like containers for transporting experiments via the space shuttle to and from an orbiting spacecraft. Once on orbit and clamped to the host spacecraft, the PECs are opened and serve as racks to expose experiments to the space environment.

Other payloads onboard were part of the Goddard Space Flight Center's Wallops Flight Facility Shuttle Small Payloads Project. The SSPP system utilizes payload carrier systems such as the Hitchhiker, Getaway Specials and Space Experiment Modules to provide a low cost scientific research environment. SSPP payloads on STS-105 include the Hitchhiker payload Simplesat, The Cell Growth in Microgravity GAS Canister (G-708), the Microgravity Smoldering Combustion experiment (MSC), and the Hitchiker Experiment Advancing Technology Space Experiment Module-10 payload).

  • STS-105 launches from Kennedy Space Center, 10 August 2001.

  • Illustration of the International Space Station during STS-105.

  • The Canadarm2 / Space Station Remote Manipulator System (SSRMS) being operated by a crew-member.

  • STS-105 lands at the Shuttle Landing Facility, 22 August 2001.

Attempt Planned Result Turnaround Reason Decision point Weather go (%) Notes
1 20010809 17:37:46 !9 Aug 2001, 5:37:46 pm scrubbed --- weather
2 20010810 17:10:14 !10 Aug 2001, 5:10:14 pm success 0 days, 23 hours, 32 minutes

Read more about this topic:  STS-105

Famous quotes containing the word mission:

    The mission of men there seems to be, like so many busy demons, to drive the forest all out of the country, from every solitary beaver swamp and mountain-side, as soon as possible.
    Henry David Thoreau (1817–1862)