Planned Messina Bridge
For decades, the possibility of building a bridge across the Messina Strait has been under discussion. In 2006, under Prime Minister Romano Prodi the project was cancelled. On 6 March 2009, however, as part of a massive new public works program, Silvio Berlusconi's government announced that plans to construct the Messina Bridge had been fully revived, pledging EUR 1.3 billion as a contribution to its estimated cost of EUR 6.1 billion Some 3.3 km long and 60 m wide, the bridge would be supported by two 382 m pillars, each higher than the Empire State Building, and accommodate six freeway lanes, a railway (for up to 200 trains a day), and two walkways.
Supporters perceive the bridge as a huge job-creation scheme and a boost for tourism to the island. Opponents see it as an ecological disaster, a structure at risk due to especially strong winds and earthquakes (the area having an intense seismic record), and a boon for Sicilian and Calabrian organized crime. Berlusconi claimed in 2009 that work would be completed by 2016.
Read more about this topic: Strait Of Messina
Famous quotes containing the words planned and/or bridge:
“Now the birth of Jesus the Messiah took place in this way. When his mother Mary had been engaged to Joseph, but before they lived together, she was found to be with child from the Holy Spirit. Her husband Joseph, being a righteous man and unwilling to expose her to public disgrace, planned to dismiss her quietly.”
—Bible: New Testament, Matthew 1:18,19.
“London Bridge is broken down,
Dance oer my lady lee,
London Bridge is broken down,
With a gay lady.
How shall we build it up again?
Dance oer my lady lee,”
—Unknown. London Bridge (l. 16)