NASA has identified the Falcon 9 vehicle not be launched under the following conditions. Some can be overridden if additional requirements are met.

  • sustained wind at the 162 feet (49 m) foot level of the launch pad in excess of 30 knots (56 km/h; 35 mph)
  • upper-level conditions containing wind shear that could lead to control problems for the launch vehicle.
  • launch through a cloud layer greater than 4,500 feet (1,400 m) thick that extends into freezing temperatures
  • launch within 10 nautical miles (19 km; 12 mi) of cumulus clouds with tops that extend into freezing temperatures,
  • within 10 nautical miles (19 km; 12 mi) of the edge of a thunderstorm that is producing lightning within 30 minutes after the last lightning is observed.
  • within 10 nautical miles (19 km; 12 mi) of an attached thunderstorm anvil cloud
  • within 5 nautical miles (9.3 km; 5.8 mi) of disturbed weather clouds that extend into freezing temperatures
  • within 3 nautical miles (5.6 km; 3.5 mi) nautical miles of a thunderstorm debris cloud,
  • through cumulus clouds formed as the result of or directly attached to a smoke plume,

The following should delay launch:

  • delay launch for 15 minutes if field mill instrument readings within 5 nautical miles (9.3 km; 5.8 mi) of the launch pad exceed +/- 1,500 volts per meter, or +/- 1,000 volts per meter
  • delay launch for 30 minutes after lightning is observed within 10 nautical miles (19 km; 12 mi) of the launch pad or the flight path

Read more about this topic:  Space Shuttle Launch Commit Criteria

Famous quotes containing the word falcon:

    The quality of decision is like the well-timed swoop of a falcon which enables it to strike and destroy its victim.
    Sun Tzu (6–5th century B.C.)