South Eastern Main Line - History

History

The line was built by the South Eastern Railway (SER), which were in competition with the London, Chatham and Dover Railway (LCDR), hence the duplication of stations in Kent.

The original main line was given sanction by Act of Parliament in 1836, running from London Bridge via Croydon East and Redhill (the London, Brighton and South Coast Railway's Brighton Main Line), Tunbridge, and Ashford to Folkestone and Dover. This circuitous route was the result of insistence on the part of Parliament that only one southerly route out of the capital was necessary; forcing the SER to share the LB&SCR's Brighton Main Line. This completely ignored the fact that the main London - Dover road had, since ancient times, followed a much more direct route; and it ignored the fact that the other great railway building projects did take direct routes whenever feasible. Under the plan, it takes a passenger 20-mile extra to travel to Dover by railway than coaching.

The main line reached Ashford on 1 December 1842; the outskirts of Folkestone by 28 June 1843; and Dover by 7 February 1844. Their locomotive works was built in 1845 moving from New Cross in London.

Due to competition with the LCDR (who had constructed the quicker Chatham Main Line and Swanley to Ashford (via Maidstone East) Line (to Sevenoaks, Canterbury, Dover, Ramsgate, Ashford and Maidstone), the SER built a very expensive line via Sevenoaks and Orpington through the North Downs by means of summits and then long tunnels at both Knockholt and Sevenoaks. This "cut-off" line, 24 miles in length, reached Chislehurst on 1 July 1865, but took three more years to reach Orpington and Sevenoaks (opening date 2 March 1868) and Tunbridge (1 May 1868).

When the SER and LCDR merged in 1899 to form the South Eastern and Chatham Railway (SECR) the stations and track layout at Ashford and Dover were rationalised.

The line was electrified with third rail, in many stages. Orpington was reached, via Victoria, in July 1925 as part of the "South Eastern Electrification - Stage 1" programme by the newly created Southern Railway, using its standard of 660V DC third rail. In February 1926 the lines from Charing Cross and Cannon Street via London Bridge to Orpington were electrified as part of the "North Kent Electrification" programme. In 1935 with the completion of London urban electrification, Southern expanded its focus to the "outer suburban" routes, with electrification extended to Sevenoaks in January 1935. Postwar, the newly nationalised British Rail started to implement its 1955 Modernisation Plan. This extended electrification to the Kent Coast in two stages, with the South Eastern Main Line being subject of "Kent Coast Electrification - Stage 2" in June 1961. This was accompanied by a voltage upgrade to 750V DC across the whole the Southern Region of British Railways.

The line was largely left untouched, until the arrival of the Channel Tunnel at Cheriton, near Folkestone. Prior to construction of High Speed 1, services joined the South Eastern Main line and ran to through to Petts Wood, where the route joined the Chatham Main Line into Waterloo International. Freight services for the Channel Tunnel were routed via the Maidstone East Line. The CTRL was built alongside the line to Ashford where is joined in to gain access to the existing station. The CTRL diverges west of Ashford to pursue a separate route to its new London terminus (St Pancras). Thus a short section of the line through Ashford is also electrified at 25 kV AC.

Read more about this topic:  South Eastern Main Line

Famous quotes containing the word history:

    The history of work has been, in part, the history of the worker’s body. Production depended on what the body could accomplish with strength and skill. Techniques that improve output have been driven by a general desire to decrease the pain of labor as well as by employers’ intentions to escape dependency upon that knowledge which only the sentient laboring body could provide.
    Shoshana Zuboff (b. 1951)

    It is the true office of history to represent the events themselves, together with the counsels, and to leave the observations and conclusions thereupon to the liberty and faculty of every man’s judgement.
    Francis Bacon (1561–1626)

    The history of any nation follows an undulatory course. In the trough of the wave we find more or less complete anarchy; but the crest is not more or less complete Utopia, but only, at best, a tolerably humane, partially free and fairly just society that invariably carries within itself the seeds of its own decadence.
    Aldous Huxley (1894–1963)