Shepherds Flat Wind Farm - Details

Details

The wind farm is located in Eastern Oregon in both Morrow and Gilliam counties, with the majority of the turbines to be in Gilliam County. Oregon provided tax incentives to the developer to help land the facility, but the project is expected to provide Gilliam County with about $5 million annually in taxes and fees when it is operating. Shepherds Flat is entirely on private property approximately 5 miles (8.0 km) southeast of the city of Arlington between Oregon Route 19 and Oregon Route 74. Construction on the project is expected to employ 400 people to build 90 miles (140 km) of power lines and 85 miles (137 km) of roads on the 30-square-mile (78 km2) wind farm.

Plans for the project first came in 2002 for a 105 megawatt project, with the plan changed to larger project in 2004. The project was then submitted to the state in 2006 with plans to have the first phase online in 2008. Early plans called for 303 turbines and a generating capacity of 909 megawatts. At the time, it would have doubled the capacity for wind-generated power in Oregon. The farm is divided into several sections, with the Willow Creek Wind Farm between two of the larger segments.

Approved in 2008 by state regulators, groundbreaking came in 2009. The project design now includes 338 GE2.5XL turbines built by GE Wind Energy, each with a capacity to produce 2.5 megawatts, and used for the first time in USA. These turbines and a ten-year service contract cost a total of $1.4 billion, the largest expense on the estimated $2 billion project. In December 2010, the Department of Energy (DOE) offered a $1.3 billion loan guarantee for the project. The insurance fee for the loan guarantee would be paid from federal stimulus money through the Financial Institution Partnership Program. Generating capacity will be 845 megawatts, producing an estimated 2 billion kW·h each year, enough to provide electricity to 235,000 homes. Once operational, the facility will have about 35 permanent employees. The wind farm is estimated to have an economic impact of $16 million annually for Oregon.

In April 2011, Google announced they had invested $100 million in the project, part of a $500 million investment package announced by GE and including as investors, also, subsidiaries of Itochu Corp. and Sumitomo Corp.. The facility was officially opened on September 22, 2012.

There are concerns that have been raised by taxpayer watchdog groups and various blogs. They point out that large private ranch owners in the area will receive up to $12,000 annually per turbine leased on their land while they have already received tens of millions of dollars in U.S. government subsidies over the years and then benefiting from taxpayer subsidies of the wind energy industry. Some local ranchers due to benefit or already benefiting from the partially government subsidized wind energy projects were published as receiving nearly $1 million in government agricultural subsidies in 2008 alone.

Read more about this topic:  Shepherds Flat Wind Farm

Famous quotes containing the word details:

    Working women today are trying to achieve in the work world what men have achieved all along—but men have always had the help of a woman at home who took care of all the other details of living! Today the working woman is also that woman at home, and without support services in the workplace and a respect for the work women do within and outside the home, the attempt to do both is taking its toll—on women, on men, and on our children.
    Jeanne Elium (20th century)

    Patience is a most necessary qualification for business; many a man would rather you heard his story than granted his request. One must seem to hear the unreasonable demands of the petulant, unmoved, and the tedious details of the dull, untired. That is the least price that a man must pay for a high station.
    Philip Dormer Stanhope, 4th Earl Chesterfield (1694–1773)

    Different persons growing up in the same language are like different bushes trimmed and trained to take the shape of identical elephants. The anatomical details of twigs and branches will fulfill the elephantine form differently from bush to bush, but the overall outward results are alike.
    Willard Van Orman Quine (b. 1908)