Model Validation and Ranking
In the last step of seismic to simulation, flow simulation continues the integration process by bringing in the production history. This provides a further validation of the static model against history. A representative set of the model realizations from the geostatistical inversion are history matched against production data. If the properties in the model are realistic, simulated well bottom hole pressure behavior should match historical (measured) well bottom hole pressure. Production flow rates and other engineering data should also match.
Based on the quality of the match, some models are eliminated. After the initial history match process, dynamic well parameters are adjusted as needed for each of the remaining models to improve the match. The final model represents the best match to original field measurements and production data and is then used in drilling decisions and production planning.
Read more about this topic: Seismic To Simulation
Famous quotes containing the words model and/or ranking:
“Socrates, who was a perfect model in all great qualities, ... hit on a body and face so ugly and so incongruous with the beauty of his soul, he who was so madly in love with beauty.”
—Michel de Montaigne (15331592)
“Falsity cannot keep an idea from being beautiful; there are certain errors of such ingenuity that one could regret their not ranking among the achievements of the human mind.”
—Jean Rostand (18941977)