Design
The crossing is 3.2 miles (5.1 km) long, consisting of a single central navigation span over the "Shoots" channel and approach viaducts on either side. The Shoots channel is the deepest section along the width of the Severn Estuary, and a longer span was required to ease the passage of shipping under this section. The central bridge section, called the Shoots Bridge, is of cable-stayed design and the central span (between the bridge pylons) is 499 yards (456.3 m) in length. The approach viaducts are of a segmental bridge design. Its Welsh end is near Sudbrook, Monmouthshire and its English end at Severn Beach in South Gloucestershire. The crossing forms a gentle S shape and near the English side crosses over the top of the Severn Tunnel.
The sides of the bridge are fitted with special railings to reduce lateral wind loads coming from the Severn Estuary onto the traffic and this has reduced the number of times that speed restrictions have been needed. The overall design of the new crossing makes it more resistant to high winds than the old Severn Bridge.
Read more about this topic: Second Severn Crossing
Famous quotes containing the word design:
“If I commit suicide, it will not be to destroy myself but to put myself back together again. Suicide will be for me only one means of violently reconquering myself, of brutally invading my being, of anticipating the unpredictable approaches of God. By suicide, I reintroduce my design in nature, I shall for the first time give things the shape of my will.”
—Antonin Artaud (18961948)
“Delay always breeds danger; and to protract a great design is often to ruin it.”
—Miguel De Cervantes (15471616)
“Joe ... you remember I said you wouldnt be cheated?... Nobody is really. Eventually all things work out. Theres a design in everything.”
—Sidney Buchman (19021975)