Santee Cooper - Santee Cooper Lakes

Santee Cooper Lakes

The Santee Cooper Power and Navigation Project, constructed in 1939, improved navigation on and provided hydroelectric power from the Santee and Cooper rivers in South Carolina. With the creation of Lake Marion and Lake Moultrie, the project was intended to improve the health, recreation, and economy of the area. At the time, the Santee Cooper Project was the largest land-clearing project in U.S. history, with over 12,500 workers clearing over 177,000 acres (720 km2) of swamp and forestland. 42 miles (68 km) of dams and dikes were constructed, including a 26-mile (42 km), 78-foot (24 m) tall earthen dike. The Pinopolis Dam included the hydroelectric station and navigation lock, the highest single-lift lock in the world. A 3,400-foot (1,000 m) spillway was built to control floodwaters, with 62 gates allowing overflow of excess water. In completing the largest earth-moving project in the nation's history, 42,000,000 cubic yards (32,000,000 m3) of earth were moved and 3.1 million cubic yards of concrete were poured.

The $48.2 million project (55 percent federal loan, 45 percent federal grant) first generated electricity on February 17, 1942. As transmission lines were built, power flowed to customers in Berkeley, Georgetown and Horry counties, and ultimately to electric cooperatives serving customers in 46 counties.

Read more about this topic:  Santee Cooper

Famous quotes containing the words cooper and/or lakes:

    A race cannot be purified from without.
    —Anna Julia Cooper (1859–1964)

    If the fairest features of the landscape are to be named after men, let them be the noblest and worthiest men alone. Let our lakes receive as true names at least as the Icarian Sea, where “still the shore” a “brave attempt resounds.”
    Henry David Thoreau (1817–1862)