San Pedro Creek - Restoration Projects

Restoration Projects

In 2005, the City of Pacifica completed a Capistrano Fish Passage restoration of the 1,300 feet (400 m) of stream bed, including the restructuring of the Capistrano Bridge culvert. The improved culvert, in addition to a system of weirs and pools restored the ability of juvenile fish to travel upstream through this portion of the creek in 2005.

In light of the historical problem of flooding, with large damaging floods occurring in 1962, 1972 and 1982 the City of Pacifica completed an ambitious five million dollar five year reconstruction project for the lower segment of San Pedro Creek in May 2005. This San Pedro Creek Flood Control Project which, in conjunction with the renovation adjacent stretches of the Pacifica State Beach, won the top national award from the American Shore and Beach Preservation Association for the year 2005.

Read more about this topic:  San Pedro Creek

Famous quotes containing the words restoration and/or projects:

    The 1990s, after the reign of terror of academic vandalism, will be a decade of restoration: restoration of meaning, value, beauty, pleasure, and emotion to art and restoration of art to its audience.
    Camille Paglia (b. 1947)

    One of the things that is most striking about the young generation is that they never talk about their own futures, there are no futures for this generation, not any of them and so naturally they never think of them. It is very striking, they do not live in the present they just live, as well as they can, and they do not plan. It is extraordinary that whole populations have no projects for a future, none at all.
    Gertrude Stein (1874–1946)