PRR GG1 - History

History

The mechanical design of the GG1 was based largely on the New Haven EP3, which had been borrowed earlier from the New Haven Railroad by the Pennsylvania to compare it to its current standard electric locomotive, the P5a. In 1933 the Pennsylvania decided to replace its P5a locomotives and told General Electric and Westinghouse to design prototype locomotives with the following specifications: a lighter axle load and more power than the P5a, be capable of at least 100 miles per hour (160 km/h), a streamlined body design and a single (central) control cab.

Both companies delivered their prototypes to the Pennsylvania in August 1934. General Electric submitted the GG1 and Westinghouse submitted the R1. The R1 was essentially "little more than an elongated and more powerful version of the P5a" with an AAR wheel arrangement of 2-D-2. Both locomotives were tested for ten weeks in regular service between New York and Philadelphia and on a test track in Claymont, Delaware. Because the R1's rigid wheelbase prevented it from negotiating sharp curves and some railroad switches, the Pennsylvania chose the GG1 and ordered 57 additional locomotives on November 10, 1934. Of the 57, 14 were to be built by General Electric in Erie and 18 at the Altoona Works. The remaining 20 locomotives were to be assembled in Altoona with electrical components from Westinghouse in East Pittsburgh and chassis from the Baldwin Locomotive Works in Eddystone. An additional 81 locomotives were then built at Altoona between 1937 and 1943.

On January 28, 1935, to mark the completion of the electric line from Washington, D.C to New York City, the Pennsylvania ran a special train pulled by PRR 4800 before it opened the line for revenue service on February 10. It made a round trip from D.C. to Philadelphia and, on its return trip, set a speed record by arriving back in D.C. 1 hour and 50 minutes after its departure from Philadelphia.

In the mid-1950s, with declining demand for passenger train service, GG1s 4801–4857 were re-geared for a maximum speed of 90 miles per hour (140 km/h) and placed in freight service. They initially retained their train heating steam generator, and were recalled to passenger service for holiday season mail trains, and 'Passenger Extras' such as those run for the annual Army–Navy football game in Philadelphia.

Styling of the prototype body shell is attributed to Westinghouse industrial designer Donald Roscoe Dohner. Subsequently the Pennsylvania hired Raymond Loewy to "enhance the GG1's aesthetics". Loewy recommended the use of a smooth, welded body instead of riveted one used in the prototype. Loewy also added five gold pinstripes and a Brunswick green paint scheme. The paint scheme was changed to Tuscan red in 1952; and the pinstripes were simplified to single stripe and large red keystones were added in 1955.

Timetable speed limit for the GG1 was 75-80 mph until October 1967 when some were allowed 100 mph for a year or two; when the Metroliner cars were being overhauled in the late 1970s GG1s were again allowed 100 mph when pulling Amfleet cars on trains scheduled to run 224.6 miles from New York to Washington in 3 hours 20–25 minutes.

Read more about this topic:  PRR GG1

Famous quotes containing the word history:

    Perhaps universal history is the history of the diverse intonation of some metaphors.
    Jorge Luis Borges (1899–1986)

    The history of American politics is littered with bodies of people who took so pure a position that they had no clout at all.
    Ben C. Bradlee (b. 1921)

    America is, therefore the land of the future, where, in the ages that lie before us, the burden of the World’s history shall reveal itself. It is a land of desire for all those who are weary of the historical lumber-room of Old Europe.
    Georg Wilhelm Friedrich Hegel (1770–1831)