Project Delivery Method - Types of Project Delivery Methods

Types of Project Delivery Methods

Common project delivery methods include:

Design-Bid-Build (DBB) or Design-Award-Build (DAB)
An owner develops contract documents with an architect or engineer consisting of a set of blueprints and a detailed specification. Bids are solicited from contractors based on these documents; a contract is then awarded to the lowest responsive and responsible bidder.
DBB with Construction Management (DBB with CM)
With partially completed contract documents, an owner will hire a construction manager to act as an agent. As substantial portions of the documents are completed, the construction manager will solicit bids from suitable subcontractors. This allows construction to proceed more quickly and allows the owner to share some of the risk inherent in the project with the construction manager.
Design-Build (DB) or Design-Construct
An owner develops a conceptual plan for a project, then solicits bids from joint ventures of architects and/or engineer and builders for the design and construction of the project.
Design-Build-Operate-Maintain (DBOM)
DBOM takes DB one step further by including the operations and maintenance of the completed project in the same original contract.
Build-Operate-Transfer (BOT)
BOT represents complete integration of the project delivery: the same contract governs the design, construction, operations, maintenance and financing of the project. After some concessionary period, the facility is transferred back to the owner.
Integrated Project Delivery (IPD)
A project delivery method in which the interests of the primary team members are aligned in such a way that the members can be integrated for optimal project performance resulting in a collaborative, value-based process delivering high-outcome results to the entire building team.

Read more about this topic:  Project Delivery Method

Famous quotes containing the words types of, types, project, delivery and/or methods:

    ... there are two types of happiness and I have chosen that of the murderers. For I am happy. There was a time when I thought I had reached the limit of distress. Beyond that limit, there is a sterile and magnificent happiness.
    Albert Camus (1913–1960)

    The bourgeoisie loves so-called “positive” types and novels with happy endings since they lull one into thinking that it is fine to simultaneously acquire capital and maintain one’s innocence, to be a beast and still be happy.
    Anton Pavlovich Chekhov (1860–1904)

    Indigenous to Minnesota, and almost completely ignored by its people, are the stark, unornamented, functional clusters of concrete—Minnesota’s grain elevators. These may be said to express unconsciously all the principles of modernism, being built for use only, with little regard for the tenets of esthetic design.
    —Federal Writers’ Project Of The Wor, U.S. public relief program (1935-1943)

    There was no speculation so promising, or at the same time so praisworthy, as the United Metropolitan Improved Hot Muffin and Crumpet Baking and Punctual Delivery Company.
    Charles Dickens (1812–1870)

    The methods by which a trade union can alone act, are necessarily destructive; its organization is necessarily tyrannical.
    Henry George (1839–1897)