Power Grid Corporation of India - Grid Management

Grid Management

Government of India entrusted POWERGRID with additional responsibility of controlling the existing Load Despatch Centres in the country with a view to achieve better Grid management and Operation in the year 1994. For improving the efficiency and management of Grid operations, POWERGRID modernised, all the Regional Load Dispatch Centres (RLDCs) with the implementation of state-of-the-art Unified Load Despatch & Communication (ULDC) scheme.. Modernization of RLDCs contributed in bringing quality and economy in power system operation besides improving data availability, visibility and transparency and alsoresulted in better Grid Management and reliable grid operation. . Taking a step further, for overall co-ordination, National Load Despatch Centre (NLDC) was established in 2009. As per the Govt. of India directive, a separate company ‘Power System Operation Corporation Limited’ (POSOCO), a 100% wholly owned subsidiary of POWERGRID, was formed in 2009 and has been entrusted with the responsibility of Grid Operation and Management.

Read more about this topic:  Power Grid Corporation Of India

Famous quotes containing the word management:

    The care of a house, the conduct of a home, the management of children, the instruction and government of servants, are as deserving of scientific treatment and scientific professors and lectureships as are the care of farms, the management of manure and crops, and the raising and care of stock.
    Catherine E. Beecher (1800–1878)