Plunger Lift - Open Well Criteria

Open Well Criteria

  • Plunger Drop Timer - Minimum close time to allow the Plunger to reach the bottom.
  • Tube - Line Pressure
  • Casing - Line Pressure
  • Casing - Tubing Pressure
  • Load Ratio (Casing-Tubing) / (Casing - Line)
  • Foss and Gaul Equation
  • Tubing Pressure
  • Casing Pressure
  • Static Pressure
  • External Variables

Read more about this topic:  Plunger Lift

Famous quotes containing the words open and/or criteria:

    To open a book brings profit.
    Chinese proverb.

    There are ... two minimum conditions necessary and sufficient for the existence of a legal system. On the one hand those rules of behavior which are valid according to the system’s ultimate criteria of validity must be generally obeyed, and on the other hand, its rules of recognition specifying the criteria of legal validity and its rules of change and adjudication must be effectively accepted as common public standards of official behavior by its officials.
    —H.L.A. (Herbert Lionel Adolphus)