Piqua Nuclear Generating Station - Plant Operating Events

Plant Operating Events

As the plant was only in operation for three years, a summary of key operating events is included

Date Action
June 1963 Initially criticality achieved.
July 1963 Fuel loading completed.
January 27, 1964 Full power achieved; reactor operated steadily but with one scram.
May 21, 1964 First scheduled shutdown for routine maintenance and inspection

During this period of operation, POMR contributed ~ 40% of the energy generated by the City of Piqua.

December 7, 1964 Reactor was shut down to renew fifteen in-vessel filters and remove the fuel element in Core position F-13 for examination.
January 28, 1965 Reactor was shut down for complete replacement of in-vessel filters, maintenance, and for

relocation of the instrumented fuel element from position E-12 to position D-5.

April 2, 1965 Several malfunctioning control rod drive units repaired. Concern over possible

plugged condition of the inner process tube of the control rod-bearing elements led to the movement of the six inner ring control rod elements to peripheral positions. The core size was increased from 61- 67 fuel elements.

May 6 – 12, 1965 Scram occurred on May 6, 1965. During this time, the reactor coolant level

had been lowered by operational error, which resulted in a temporary loss of circulation through three elements. Shutdown was extended until May 12 so the three fuel elements could be removed to spent-fuel storage.

May 13, 1965 (est) Immediately upon restart, excessive surface temperatures were noted, necessitating

additional fuel element removal. Because of the fuel element removal, the system operated with only one coolant pump during the latter half of June and into July.

July 18, 1965 Reactor shut down for modifications, maintenance, and in-vessel filter replacement;

performed extensive modifications of the in-core control rod circuitry.

September 6, 1965 Reactor operation resumed.
October 12, 1965 Reactor shut down, fuel rearrangements were made, increasing the core loading to 70 fuel elements.
October 23, 1965 Reactor restarted. Operation of the reactor continued at an average power level of about 24 MWt.
January 13, 1966 Reactor scrammed because of a spurious signal. At this time, there was no

indication of any unusual condition in the reactor core. Prior to restarting the reactor, an abnormal in-core condition was identified during the performance of a rod-drop test.

Read more about this topic:  Piqua Nuclear Generating Station

Famous quotes containing the words plant, operating and/or events:

    In a virtuous action, I properly am; in a virtuous act, I add to the world; I plant into deserts conquered from Chaos and Nothing, and see the darkness receding on the limits of the horizon.
    Ralph Waldo Emerson (1803–1882)

    I love meetings with suits. I live for meetings with suits. I love them because I know they had a really boring week and I walk in there with my orange velvet leggings and drop popcorn in my cleavage and then fish it out and eat it. I like that. I know I’m entertaining them and I know that they know. Obviously, the best meetings are with suits that are intelligent, because then things are operating on a whole other level.
    Madonna [Madonna Louise Ciccione] (b. 1959)

    Whatever events in progress shall disgust men with cities, and infuse into them the passion for country life, and country pleasures, will render a service to the whole face of this continent, and will further the most poetic of all the occupations of real life, the bringing out by art the native but hidden graces of the landscape.
    Ralph Waldo Emerson (1803–1882)