Piper Alpha - Piper Oil Field

Piper Oil Field

Four companies that later transformed into the OPCAL joint venture obtained an oil exploration licence in 1972 and discovered the Piper oilfield located at 58°28′N 0°15′E / 58.467°N 0.25°E / 58.467; 0.25 in early 1973 and commenced fabrication of the platform, pipelines and onshore support structures. Oil production started in 1976 with about 250,000 barrels (40,000 m3) of oil per day increasing to 300,000 barrels (48,000 m3). A gas recovery module was installed by 1980. Production declined to 125,000 barrels (19,900 m3) by 1988. OPCAL built the Flotta oil terminal in the Orkney Islands to receive and process oil from the fields Piper, Claymore and Tartan, each with its own platform. One thirty inch (0.762 m) diameter main oil pipeline ran 128 miles (206 kilometres) from Piper Alpha to Flotta, with a short oil pipeline from the Claymore platform joining it some twenty miles (32 km) to the west. The Tartan field also fed oil to Claymore and then onto the main line to Flotta. Separate 18 inch (46 cm) diameter gas pipelines run from Piper to the Tartan platform, and from Piper to the gas compressing platform MCP-01 some 30 miles (48 km) to the northwest.

Read more about this topic:  Piper Alpha

Famous quotes containing the words piper, oil and/or field:

    A piper in the streets to-day
    Set up, and tuned, and started to play,
    “Seumas” “O’Sullivan” (1879–1958)

    Eat what you can get.
    Where’s the salt
    in this dump of a village?
    And, Lucky Man,
    what’s the use
    of a salty thing
    if there’s no oil in it?
    Hla Stavhana (c. 50 A.D.)

    The head must bow, and the back will have to bend,
    Wherever the darkey may go;
    A few more days, and the trouble all will end,
    In the field where the sugar-canes grow.
    A few more days for to tote the weary load,—
    No matter, ‘t will never be light;
    A few more days till we totter on the road:—
    Then my old Kentucky home, good-night!
    Stephen Collins Foster (1826–1884)