Phaya Thai Airport Link Station - Specifications

Specifications

The standard gauge line is 28.6 km long and is elevated, running above the existing eastern railway, with an underground terminal at the airport. Both non-stop Suvarnabhumi Airport Express services and "stopping" Suvarnabhumi Airport City Line commuter services are operated, with Express journeys taking 15 minutes from Makkasan and 18 minutes from Phaya Thai while Commuter trips take 27 minutes.

Siemens supplied nine Desiro Class 360/2 trainsets. The only significant difference from the UK units is a much larger air-conditioning pod on the roof, providing extra power to cope with the Thai climate. City services is operated by five three-car trains, and the Express services by four trainsets with a fourth car for check-in baggage. The first trains left Germany in September 2007, and testing in Bangkok began in March 2008. On 15 May 2012 the Thai Cabinet approved a budget of 5.2 billion baht for the SRT to order 7 new, 4 car sets of Siemens Desiro rolling stock to be delivered by 2014. However, as of June 2013 no order for new rolling stock had yet been placed. The Ministry of Transport was considering purchasing cheaper Chinese (CNR) or Spanish (CAF) rolling stock which would require changing the Siemens closed signalling system to an open system.

The line is electrified at 25 kV AC. All stations were built to accommodate 10-car trains, and the express train platform of Makkasan station and all platforms at Suvarnabhumi are fitted with platform automatic screen doors. The top speed is 160 km/h, but the short distances between the stations imply that commuter services don't reach that speed.

At Makkasan and Suvarnabhumi, both lines have their own tracks and platforms. At Hua Mak the express line can bypass the city line via a passing loop.

Read more about this topic:  Phaya Thai Airport Link Station