The highway was signed in 1927 from Pittsburgh to Kittanning.

The highway was extended north to Brockway in 1928. In 1928, the route was under construction from Blawnox to Cheswick, Troy Hill Road to Oakland, and Hazen to Reitz Crossing Road. Those sections were completed the following year. In 1929, the section from Avella to Woodrow and from Hickory to Fort Cherry Road was under construction and finished the following year. In 1930, the section from Skyline Road to PA 18 was paved as well as in Venice. That year the western terminus was moved from Avella to Independence. In 1958, the highway was widened and a median installed at the interchange with the Turnpike. In 1961, the highways southern terminus was moved from Independence to PA 8 in Etna. The former section of PA 28 from South Main St. in the West End Valley to the intersection of Noblestown Rd. and Crafton Blvd. in Crafton Heights was redesignated as PA 60. The remaining 83-mile stretch from Crafton Heights to Independence was renumbered PA 50.

In 1963, this section opened to traffic from PA 8 north to the Highland Park Bridge interchange and the following year to Blawnox. Also that year, the Pittsburgh Area Transportation Plan recommended upgrading PA 28 and then PA 8, to a six-lane, limited-access highway starting 2,200 feet (670 m) west of the 31st Street Bridge and ending at the 40th Street Bridge. Full interchanges would be constructed at both bridges; however, this recommendation was not carried out. It also laid out a plan that would turn PA 28 into an expressway from Pittsburgh to Brookville, this too was not carried out.

In 1964, the highway was widened and a median installed on it between Brackenridge and the Butler County line. In 1968, construction began on the section from Blawnox to PA 910. The expressway was proposed from that point to the Butler County line. Construction also began on the section from Slate Lick to near Center Hill in the same year. In 1965, the route was moved from Courthouse Road into Kittanning to bypass the borough on its current alignment. In 1969, construction commenced on the section from PA 910 to Exit 12 and from Exit 16 to PA 356 and the Armstrong County line.

The start of the 1970s saw the construction extend from Exit 16 all the way to a new expressway alignment for US 422, also under construction, near West Kittanning. In 1971, construction commenced on the section from Exit 15 to Exit 16. In 1972, the expressway opened to traffic from Blawnox to PA 910 and from Exit 15 to US 422. However, PA 28's designation was not placed on the section from Exit 15 to Exit 16. The following year, the expressway opened from PA 910 to Exit 12.

In 1973, the route was extended to end at US 19/PA 65 at Chateau Street via Western Avenue and East Ohio Street.

In 1975, construction commenced on the section from Exit 12 to north of Tarentum; and during the following year, the construction was extended to Exit 15. In 1978, the PA 28 designation was routed onto the newly opened highway from Exit 11 to Exit 12 and from Exit 15 to Exit 16. The PA 28 designation still followed Freeport Road to connect between Exit 12 and Exit 15.

In 1980, the expressway opened from Exit 12 to Exit 13 and the PA 28 designation was moved onto this section. In 1984, the route was changed to follow Western Avenue, Allegheny Avenue, North Shore Drive, General Robinson Street, and Madison Avenue for northbound traffic, and Reedsdale Street for southbound traffic in Pittsburgh. The final section of the Allegheny Valley Expressway between Exit 13 and Exit 15 opened in 1985.

In 2011, the southbound lanes of PA 28 were shifted to bypass the intersection of the 40th Street Bridge. The northbound lanes are expected to be shifted in 2012 when an excavation lowers the roadbed of PA 28.

Read more about this topic:  Pennsylvania Route 28

Famous quotes containing the word history:

    Look through the whole history of countries professing the Romish religion, and you will uniformly find the leaven of this besetting and accursed principle of action—that the end will sanction any means.
    Samuel Taylor Coleridge (1772–1834)

    Social history might be defined negatively as the history of a people with the politics left out.
    —G.M. (George Macaulay)

    The principal office of history I take to be this: to prevent virtuous actions from being forgotten, and that evil words and deeds should fear an infamous reputation with posterity.
    Tacitus (c. 55–c. 120)