Operations
New Bullards Bar Reservoir provides flood control space between September 15 and May 31 of each year. There are 170,000 acre feet (210,000,000 m3) of flood control storage space between October 31 and March 31.
The dam furnishes water to the New Colgate Powerhouse, which is located 5 miles (8.0 km) downstream. The added distance increases the head (i.e. elevation change). Its two Pelton wheels have a combined capacity of 315 megawatts and are some of the largest ever made. The small Fish Release powerhouse was constructed in 1986 at the base of the dam. It has a capacity of 150 kilowatts and generates power from water releases for fish on the Yuba River.
A 14-foot (4.3 m)-diameter penstock drains water from the New Bullards Bar Reservoir several miles through a mountain and down a large hill to deliver water to the Colgate Powerhouse. In 2006 a 168 inch (4.3 m) butterfly valve was designed and manufactured in Europe for installation in the penstock at the top of the hill to protect the powerhouse from flooding in the event that an earthquake or other event caused the penstock to rupture. This valve uses a design similar to that of the dam's base release works.
Read more about this topic: New Bullards Bar Dam
Famous quotes containing the word operations:
“It may seem strange that any road through such a wilderness should be passable, even in winter, when the snow is three or four feet deep, but at that season, wherever lumbering operations are actively carried on, teams are continually passing on the single track, and it becomes as smooth almost as a railway.”
—Henry David Thoreau (18171862)
“You cant have operations without screams. Pain and the knifetheyre inseparable.”
—Jean Scott Rogers. Robert Day. Mr. Blount (Frank Pettingell)
“Plot, rules, nor even poetry, are not half so great beauties in tragedy or comedy as a just imitation of nature, of character, of the passions and their operations in diversified situations.”
—Horace Walpole (17171797)